{"id":29501,"date":"2020-11-16T23:14:08","date_gmt":"2020-11-17T03:14:08","guid":{"rendered":"https:\/\/vipfesta.com.br\/vipfesta\/?p=29501"},"modified":"2020-11-16T23:14:12","modified_gmt":"2020-11-17T03:14:12","slug":"ponte-sobre-o-rio-urupa-em-ji-parana-sera-inaugurada-nesta-terca-feira-17","status":"publish","type":"post","link":"https:\/\/vipfesta.com.br\/vipfesta\/ponte-sobre-o-rio-urupa-em-ji-parana-sera-inaugurada-nesta-terca-feira-17\/","title":{"rendered":"Ponte sobre o rio Urup\u00e1 em Ji-Paran\u00e1 ser\u00e1 inaugurada nesta ter\u00e7a-feira, 17"},"content":{"rendered":"\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"545\" src=\"https:\/\/vipfesta.com.br\/vipfesta\/wp-content\/uploads\/2020\/11\/DER-conclui-ponte-em-JiParana1-12.11.2020-Luiz-Augusto-Rocha-1024x545.jpg\" alt=\"\" class=\"wp-image-29502\" srcset=\"https:\/\/vipfesta.com.br\/vipfesta\/wp-content\/uploads\/2020\/11\/DER-conclui-ponte-em-JiParana1-12.11.2020-Luiz-Augusto-Rocha-1024x545.jpg 1024w, https:\/\/vipfesta.com.br\/vipfesta\/wp-content\/uploads\/2020\/11\/DER-conclui-ponte-em-JiParana1-12.11.2020-Luiz-Augusto-Rocha-300x160.jpg 300w, https:\/\/vipfesta.com.br\/vipfesta\/wp-content\/uploads\/2020\/11\/DER-conclui-ponte-em-JiParana1-12.11.2020-Luiz-Augusto-Rocha-768x409.jpg 768w, https:\/\/vipfesta.com.br\/vipfesta\/wp-content\/uploads\/2020\/11\/DER-conclui-ponte-em-JiParana1-12.11.2020-Luiz-Augusto-Rocha-150x80.jpg 150w, https:\/\/vipfesta.com.br\/vipfesta\/wp-content\/uploads\/2020\/11\/DER-conclui-ponte-em-JiParana1-12.11.2020-Luiz-Augusto-Rocha.jpg 1280w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption>Equipes do DER conseguiram imprimir um ritmo de trabalho \u00e1gil e de qualidade garantida pelo acompanhamento t\u00e9cnico do corpo de engenheiros do \u00f3rg\u00e3o, top\u00f3grafos, laboratoristas, entre outros<\/figcaption><\/figure>\n\n\n\n<p>As obras na ponte sobre o rio Urup\u00e1, na RO-135, em Ji-Paran\u00e1, est\u00e3o finalizadas e o Governo de Rond\u00f4nia vai realizara a inaugura\u00e7\u00e3o nesta ter\u00e7a-feira (17). Em quatro meses de trabalho, o Departamento Estadual de Estradas de Rodagem e Transportes (DER) ergueu os aterros das duas cabeceiras, pavimentando 615 metros de via, fez as obras de arte de drenagem, instala\u00e7\u00e3o de defensas e coloca\u00e7\u00e3o de gramado nas laterais.<\/p>\n\n\n\n<p>De acordo com o residente regional do DER em Ji-Paran\u00e1, engenheiro Klayson Furtado, ap\u00f3s a determina\u00e7\u00e3o do governador Marcos Rocha, os trabalhos tiveram in\u00edcio na primeira semana de julho. \u201cO diretor-geral, Elias Rezende, articulou a forma\u00e7\u00e3o de uma for\u00e7a-tarefa entre as regionais do DER para que o servi\u00e7o de encabe\u00e7amento da ponte ganhasse celeridade\u201d, explica o engenheiro Klayson.<a href=\"https:\/\/data.portal.sistemas.ro.gov.br\/2020\/11\/DER-conclui-ponte-em-JiParan%C3%A12-12.11.2020-Luiz-Augusto-Rocha.jpg\" target=\"_blank\" rel=\"noopener\"><\/a><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"683\" src=\"https:\/\/vipfesta.com.br\/vipfesta\/wp-content\/uploads\/2020\/11\/DER-conclui-ponte-em-JiParana2-12.11.2020-Luiz-Augusto-Rocha-1024x683.jpg\" alt=\"\" class=\"wp-image-29503\" srcset=\"https:\/\/vipfesta.com.br\/vipfesta\/wp-content\/uploads\/2020\/11\/DER-conclui-ponte-em-JiParana2-12.11.2020-Luiz-Augusto-Rocha-1024x683.jpg 1024w, https:\/\/vipfesta.com.br\/vipfesta\/wp-content\/uploads\/2020\/11\/DER-conclui-ponte-em-JiParana2-12.11.2020-Luiz-Augusto-Rocha-300x200.jpg 300w, https:\/\/vipfesta.com.br\/vipfesta\/wp-content\/uploads\/2020\/11\/DER-conclui-ponte-em-JiParana2-12.11.2020-Luiz-Augusto-Rocha-768x512.jpg 768w, https:\/\/vipfesta.com.br\/vipfesta\/wp-content\/uploads\/2020\/11\/DER-conclui-ponte-em-JiParana2-12.11.2020-Luiz-Augusto-Rocha-150x100.jpg 150w, https:\/\/vipfesta.com.br\/vipfesta\/wp-content\/uploads\/2020\/11\/DER-conclui-ponte-em-JiParana2-12.11.2020-Luiz-Augusto-Rocha.jpg 1280w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption>A for\u00e7a-tarefa do DER levou quatro meses para executar o trabalho<\/figcaption><\/figure>\n\n\n\n<p>Ao longo do per\u00edodo de seca, as equipes do DER conseguiram imprimir um ritmo de trabalho \u00e1gil e de qualidade garantida pelo acompanhamento t\u00e9cnico do corpo de engenheiros do \u00f3rg\u00e3o, top\u00f3grafos, laboratoristas, entre outros. \u201cCom a vinda de novos servidores aprovados em processo seletivo no m\u00eas de setembro e otimiza\u00e7\u00e3o no uso do maquin\u00e1rio, conseguimos avan\u00e7ar no cronograma al\u00e9m das expectativas\u201d, ressalta o coordenador de Opera\u00e7\u00f5es e Fiscaliza\u00e7\u00e3o do Departamento, Adriano Furtunato.<\/p>\n\n\n\n<p>Em vistoria recente ao canteiro de obras, o governador fez quest\u00e3o de frisar a import\u00e2ncia da conclus\u00e3o do encabe\u00e7amento da ponte sobre o rio Urup\u00e1. \u2018\u2018Tenho acompanhado esse trabalho desde o in\u00edcio, pois era uma estrutura parada h\u00e1 anos, junto com o Elias Rezende e a equipe do DER, percebendo que s\u00f3 tinha a ponte velha que foi palco de v\u00e1rios acidentes, providenciamos as condi\u00e7\u00f5es para que a popula\u00e7\u00e3o tenha o acesso devido, resguardado o direito de ir e vir com seguran\u00e7a\u2019\u2019, explica o coronel Marcos Rocha.<\/p>\n\n\n\n<p>Localizada na RO-135, sa\u00edda de Ji-Paran\u00e1 sentido ao distrito de Nova Londrina e \u00e0 BR-429, a ponte foi constru\u00edda por uma empresa contratada em 2017, com uma extens\u00e3o de 150 metros e largura de 11,20 metros, num investimento \u00e0 \u00e9poca em torno de R$ 6 milh\u00f5es. No entanto, ela n\u00e3o foi entregue \u00e0 popula\u00e7\u00e3o, uma vez que no projeto licitado n\u00e3o constavam os servi\u00e7os de constru\u00e7\u00e3o das cabeceiras.<a href=\"https:\/\/data.portal.sistemas.ro.gov.br\/2020\/11\/DER-conclui-ponte-em-JiParan%C3%A13-12.11.2020-Luiz-Augusto-Rocha.jpg\" target=\"_blank\" rel=\"noopener\"><\/a><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"683\" src=\"https:\/\/vipfesta.com.br\/vipfesta\/wp-content\/uploads\/2020\/11\/DER-conclui-ponte-em-JiParana3-12.11.2020-Luiz-Augusto-Rocha-1024x683.jpg\" alt=\"\" class=\"wp-image-29504\" srcset=\"https:\/\/vipfesta.com.br\/vipfesta\/wp-content\/uploads\/2020\/11\/DER-conclui-ponte-em-JiParana3-12.11.2020-Luiz-Augusto-Rocha-1024x683.jpg 1024w, https:\/\/vipfesta.com.br\/vipfesta\/wp-content\/uploads\/2020\/11\/DER-conclui-ponte-em-JiParana3-12.11.2020-Luiz-Augusto-Rocha-300x200.jpg 300w, https:\/\/vipfesta.com.br\/vipfesta\/wp-content\/uploads\/2020\/11\/DER-conclui-ponte-em-JiParana3-12.11.2020-Luiz-Augusto-Rocha-768x512.jpg 768w, https:\/\/vipfesta.com.br\/vipfesta\/wp-content\/uploads\/2020\/11\/DER-conclui-ponte-em-JiParana3-12.11.2020-Luiz-Augusto-Rocha-150x100.jpg 150w, https:\/\/vipfesta.com.br\/vipfesta\/wp-content\/uploads\/2020\/11\/DER-conclui-ponte-em-JiParana3-12.11.2020-Luiz-Augusto-Rocha.jpg 1280w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption>A ponte interliga a regi\u00e3o Central ao Vale do Guapor\u00e9<\/figcaption><\/figure>\n\n\n\n<p>O Governo do Estado, por meio do DER, fez o trabalho para destravar essa obra inconclusa. \u201cArrega\u00e7amos as mangas e partimos para a a\u00e7\u00e3o. O DER tem a capacidade t\u00e9cnica, tem um quadro de servidores com compet\u00eancia e experi\u00eancia e tem o maquin\u00e1rio necess\u00e1rio. Era uma quest\u00e3o de fazer a gest\u00e3o correta de tudo isso e colocar um fim num problema que vinha afetando toda a regi\u00e3o central do Estado\u201d, detalha Rezende.<\/p>\n\n\n\n<p>Com isto, foi poss\u00edvel fazer por execu\u00e7\u00e3o direta o encabe\u00e7amento da ponte sobre o rio Urup\u00e1 com 615 metros de aterro e compacta\u00e7\u00e3o, pavimenta\u00e7\u00e3o asf\u00e1ltica, obras de drenagem pluvial (bueiros, caixa de conten\u00e7\u00e3o e calhas de concreto), defensa (guard-rail), sarjeta e meio-fio, coloca\u00e7\u00e3o de gramado, al\u00e9m do aproveitamento da lateral e da antiga ponte como ciclofaixa e passagem para pedestres. O diretor-geral finaliza enfatizando que, \u201ctodo esse trabalho executado diretamente pelo DER, pelos valorosos servidores, \u00e9 um investimento do Governo do Estado para a popula\u00e7\u00e3o de Rond\u00f4nia\u201d.<\/p>\n\n\n\n<p>No DER, as a\u00e7\u00f5es est\u00e3o voltadas \u00e0 padroniza\u00e7\u00e3o, com vistas \u00e0 qualidade dos resultados, desde a identifica\u00e7\u00e3o de prioridades, garantia do melhor uso dos materiais e equipamentos at\u00e9 a valoriza\u00e7\u00e3o do quadro t\u00e9cnico e oper\u00e1rios. Assim, sua miss\u00e3o \u00e9 alcan\u00e7ar melhores resultados, gerar economia, evitar desperd\u00edcios de materiais e retrabalho, materializando-se na recupera\u00e7\u00e3o, manuten\u00e7\u00e3o e melhoria de mais de 6.000 quil\u00f4metros de vias com e sem pavimenta\u00e7\u00e3o sob responsabilidade do Governo de Rond\u00f4nia.<\/p>\n\n\n\n<p>A entrega oficial da ponte com a obra conclu\u00edda acontece nesta ter\u00e7a-feira (17), em Ji-Paran\u00e1.<\/p>\n\n\n\n<p>Paulo S\u00e9rgio\/Secom<\/p>\n\n\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>As obras na ponte sobre o rio Urup\u00e1, na RO-135, em Ji-Paran\u00e1, est\u00e3o finalizadas e o Governo de Rond\u00f4nia vai<\/p>\n","protected":false},"author":1,"featured_media":29502,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"colormag_page_container_layout":"default_layout","colormag_page_sidebar_layout":"default_layout","footnotes":""},"categories":[283],"tags":[101,19],"class_list":["post-29501","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-cidades","tag-inauguracao","tag-ji-parana"],"_links":{"self":[{"href":"https:\/\/vipfesta.com.br\/vipfesta\/wp-json\/wp\/v2\/posts\/29501","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/vipfesta.com.br\/vipfesta\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/vipfesta.com.br\/vipfesta\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/vipfesta.com.br\/vipfesta\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/vipfesta.com.br\/vipfesta\/wp-json\/wp\/v2\/comments?post=29501"}],"version-history":[{"count":1,"href":"https:\/\/vipfesta.com.br\/vipfesta\/wp-json\/wp\/v2\/posts\/29501\/revisions"}],"predecessor-version":[{"id":29505,"href":"https:\/\/vipfesta.com.br\/vipfesta\/wp-json\/wp\/v2\/posts\/29501\/revisions\/29505"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/vipfesta.com.br\/vipfesta\/wp-json\/wp\/v2\/media\/29502"}],"wp:attachment":[{"href":"https:\/\/vipfesta.com.br\/vipfesta\/wp-json\/wp\/v2\/media?parent=29501"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/vipfesta.com.br\/vipfesta\/wp-json\/wp\/v2\/categories?post=29501"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/vipfesta.com.br\/vipfesta\/wp-json\/wp\/v2\/tags?post=29501"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}